Michigan’s Premier Data Center Development Portfolio

Four strategically located Michigan sites—each engineered for rapid deployment, redundant power, and renewable energy integration. Cooler climate, lower utility rates, and central Midwest positioning make these properties ideal for hyperscale and enterprise data center operations.

Key Advantages

  • 100% operational capacity within 12 months
  • $90M generator fleet (100 MW total capacity) included
  • Power rates nearly 50% lower than traditional markets
  • Triple power grids, hydroelectric, natural gas & solar-ready infrastructure
  • Strategic Midwest location close to Chicago, Detroit & Grand Rapids

Why Michigan Outperforms Traditional Data Center Markets

Michigan provides some of the best environmental and economic conditions for high-density data center operations.

Cool Climate.
Naturally cool temperatures reduce cooling loads for six or more months each year.
Lower Power Costs.
Industrial electric service is nearly half the cost of many coastal data center markets.
Strong Renewable Opportunities.
Solar, hydroelectric, and natural gas extend long-term energy resilience.
Strategic Midwest Access.
Central U.S. positioning enables low-latency connectivity to major population centers.

Explore the Portfolio

Four Sites. Unlimited Potential.

A unified portfolio of four Michigan properties—each with unique strengths, yet all featuring rapid deployment timelines and redundant power infrastructure.

Property 1: Lake Michigan Industrial Park — Manistee, MI

Solar-Ready Development • 5.4 Acres Total • Operational in 12 Months

Located in the Lake Michigan Industrial Park, this dual-parcel site offers 5.4 acres of light-industrial land ideally suited for data center development. Both parcels are rooftop-solar-ready and supported by high-capacity natural gas and multiple industrial-grade power feeds.

Key Advantages

  • 100% operational capacity within 12 months

  • $90M generator fleet (100 MW total capacity) included

  • Power rates nearly 50% lower than traditional markets

  • Triple power grids, hydroelectric, natural gas & solar-ready infrastructure

  • Strategic Midwest location close to Chicago, Detroit & Grand Rapids

Infrastructure Advantages

  • Multiple industrial power feeds for high reliability

  • High-capacity natural gas service

  • Centralized regional access for logistics

  • Rooftop solar potential covering ~235,000 sq ft

Renewable Power Potential

Full rooftop solar installation can generate an estimated 5.5–6.0 MW, offsetting substantial energy loads and significantly reducing operational costs.

Property 2: Mid-Michigan Data Center Campus — 20 Acres

Triple Power Grids • Hydroelectric Capability • 18 Acres Solar Ready

This expansive 20-acre campus sits within an hour of Lansing, Detroit, Grand Rapids, Flint, or Saginaw. It is one of the only Michigan properties offering triple redundant power grids plus on-site hydroelectric and large-scale solar potential.

Key Advantages

  • 20-acre campus

  • Industrial-grade facilities already on-site

  • Newly renovated office & support space

  • Lease: $50,000/mo • Sale: $100,000,000

  • Ready for full operational capacity within 12 months

Energy Features

  • Triple independent power grids

  • Direct ownership of switchgear and transformers

  • High-capacity natural gas available

  • On-site hydroelectric dam (0.2 MW)

  • 18 acres suitable for 3.0 MW of ground-mount solar

Renewable Production Potential

Combined solar + hydroelectric generation up to 3.2 MW, with estimated annual energy value reaching $315,000–$525,000.

Property 3: Chesaning — 38,000 Sq Ft Data Center Facility

Ready-to-Deploy Structure • Expansion Opportunities

This 38,000 sq ft commercial/industrial facility provides a structurally robust shell for high-density data center buildout. Large open interior spaces, raised rooflines, and extensive parking make the site ideal for rapid conversion.

Key Advantages

  • 38,000 sq ft facility

  • Zoned Commercial / Industrial

  • Multiple offices & support areas

  • Ample parking and site accessibility

  • Lease: $15,000/mo • Sale: $90,600,000

  • Full operational capability within 12 months

Facility Strengths

  • Strong electrical & mechanical infrastructure potential

  • Excellent expansion capabilities

  • Highly flexible floor plan for colocation, enterprise, or hyperscale deployments

Property 4: Michigan Industrial Facility — 46,820 Sq Ft on 8.55 Acres

High-Ceiling Industrial Complex with Cranes & Air Systems

Constructed in 1996, this L-shaped 46,820 sq ft industrial complex provides substantial ceiling height, cranes, air recovery systems, and well-maintained utility infrastructure. Ideal for large data center conversions requiring heavy equipment handling and thermal management systems.

Key Advantages

  • 46,820 sq ft industrial building

  • 8.55 acres

  • Steel, block, vinyl & aluminum construction

  • Lease: $25,000/mo • Sale: $98,000,000

  • 100% capacity achievable within 12 months

Infrastructure Advantages

  • Three-phase electric

  • Natural gas supply

  • Private well & septic

  • Multiple overhead cranes

  • Air recovery systems installed

Power Strategy & Redundancy

$90 Million Generator Fleet Included Across All Sites

To ensure immediate operational capability before full grid interconnection, every site includes access to a dedicated 100 MW diesel generator fleet.

Strategic Benefits

  • 45 generators total

  • Each generator: 3 MW

  • 34 primary + 11 redundancy units

  • Total investment: $90,000,000

Investment Overview

  • Guaranteed 100 MW baseline capacity

  • Redundancy eliminates downtime during maintenance

  • Generators operate at peak efficiency for extended lifespan

  • Data centers can participate in Demand Response Programs, generating revenue while stabilizing the grid

On-Site Renewable Energy Integration

Each site is engineered to support long-term sustainability through on-site renewable production.

Solar Energy

  • 5.5–6.0 MW rooftop potential (Manistee)

  • 3.0 MW ground-mount potential (Mid-Michigan)

Hydroelectric Energy

  • 0.2 MW run-of-river generation potential on the Mid-Michigan campus

Natural Gas

  • High-capacity natural gas lines support backup generation and thermal systems

These renewable opportunities reduce long-term energy costs while strengthening ESG positioning.

Why These Sites Win

Across all four properties, investors and operators gain:

  • Rapid operational timeline (12 months)
  • Redundant multi-grid power capabilities
  • Renewable-ready infrastructure
  • Large-acreage scalability
  • Below-market utility pricing
  • Strategic Midwest logistics & latency performance
  • Strong industrial zoning and existing infrastructure

About the Developer

Led by Michigan Development Director Beau Parmenter

Beau Parmenter specializes in identifying and developing high-value commercial, industrial, and energy-capable properties across Michigan. His development philosophy emphasizes renewable integration, robust infrastructure, and long-term economic viability—an approach reflected throughout this data center portfolio.

Request More Information

Receive detailed schematics, site plans, electrical diagrams, renewable potential assessments, or to schedule a site tour.

Contact:

Beau Parmenter, Development Director